Time of installation
Our installation partner will contact you within 1-3 days of the order and agree on the time of installation and other necessary details. Athe time of installation is agreed with the installer, taking into account the delivery time of the product and the requirements of the object.
Availability of installation service
The installation service is available in Finland in the following areas:
- Etelä-Karjala
- Etelä-Pohjanmaa
- Etelä-Savo
- Kanta-Häme
- Kainuu
- Keski-Pohjanmaa
- Keski-Suomi
- Kymenlaakso
- Pirkanmaa
- Pohjanmaa
- Pohjois-Pohjanmaa
- Pohjois-Karjala
- Pohjois-Savo
- Päijät-Häme
- Satakunta
- Uusimaa
- Varsinais-Suomi
The price includes
- Remote mapping
- Surface installation of the charging device on the wall (installation duration max. 4 hours).
- Surface installation of the charging station's supply cable (5×2.5mm2 MMJ, maximum 10 m) and connection directly to the property's electrical center
- Connection to free fuse and residual current protection
- One pass-through to the wooden structure
- However, adjusting the charging power (1.8 – 11 kW) as high as possible according to the properties of the property.
- Commissioning inspection and documentation
- Instructions for use for the customer
The price does not include
- Cable protectors, residual current protection switches, module housings, energy meters, fire breaks, earthworks, stone wall penetrations.
- Hours and accessories beyond the basic installation are charged separately according to the additional work price list
Note:
- The customer waives the 14-day right of cancellation/return once the installation work has started.